MURB ENERGY PLANNING

MURB Energy Roadmap & CMHC MLI Select Modelling

Building-level baseline, upgrade scenario comparison, energy and GHG modelling, and a prioritized decision roadmap for multi-unit owners, developers and financing teams.

Ontario projects · Existing buildings and pre-construction

WHEN THIS SERVICE FITS

A dedicated decision tool for an owner’s next capital step.

This page focuses on the planning and modelling deliverable—not the full range of MURB assessment, installation and ongoing HVAC services.

EXISTING BUILDING

Retrofit or Repositioning

Compare practical upgrade bundles before major HVAC replacement, refinancing, acquisition or phased capital work.

NEW PROJECT

Pre-Construction Roadmap

Test the intended design path early, while envelope, HVAC, DHW, ventilation and electrical choices can still be adjusted.

FINANCING

MLI Select Pathway

Organize baseline and proposed modelling, energy and GHG results, assumptions and supporting information for financing discussions.

FIELD + MODEL + REPORT

Energy modelling connected to real building conditions.

PWH combines energy-assessment work with hands-on HVAC and building-upgrade experience. That helps us challenge model assumptions before they become project problems.

Envelope · Boiler / hydronic · Heat pumps · DHW · HRV / ERV · Electrical limits

On-site assessment and building facts

Model review and scenario checks

Existing mechanical conditions

WHY OWNERS CONTACT US

Usually, there is one decision holding the project up.

We do not begin with a generic report. We begin with the financing question, available building information and the decision your team needs to make.

LENDER REQUEST

Your financing team asked for energy modelling.

We confirm the building type, modelling pathway and information needed before you spend money on a report.

DESIGN DECISION

You need to know which upgrade path can reach the target.

We compare complete options—envelope, HVAC, DHW and ventilation—using the same baseline.

PROJECT RISK

The result is close, and small assumptions could change it.

We show the assumptions, sensitivities and missing inputs so the team can act before submission.

SCOPE BOUNDARY

What the roadmap does—and what follows afterward.

Included in the Roadmap

  • Building and project-scope review
  • Applicable baseline and energy modelling
  • Upgrade-bundle comparison
  • Energy and GHG results
  • Assumptions, sensitivities and risks
  • Prioritized roadmap and decision summary

Normally Required Later

  • Detailed engineering and permit documents
  • Final contractor quotations and procurement
  • Authority, lender or CMHC approval
  • Installation, commissioning and close-out
  • Final attestation where applicable and only after the design pathway is confirmed

Program rules, reference baselines and documentation requirements may change. Final eligibility and financing decisions remain with the applicable lender, CMHC, program administrator or authority.

Design-stage review

BEFORE MODELLING BEGINS

First, we confirm the pathway and the missing information.

A short preliminary review helps avoid ordering the wrong model, using an inapplicable baseline or promising a result before the design is stable.

  • Property type, location, unit count and storeys
  • Existing building or pre-construction project
  • Current or proposed HVAC, DHW and ventilation
  • Drawings, utility information and design status
  • Lender request, target and submission timing

In-house

NRCan-registered energy advisor

Technical focus

HOT2000 and Part 9 low-rise MURBs

Project types

Existing + selected pre-construction

Practical lens

Assessment, HVAC and upgrade delivery

START WITH THE DECISION QUESTION

Tell us what you are trying to verify before committing capital.

Share the property type, number of units, project stage, current mechanical system and the financing or upgrade decision you need to address.

Discuss Your Building

Share the basic property information. We will follow up to confirm whether an initial discussion is appropriate.

Rebate, incentive and financing eligibility is subject to current program rules, property conditions and approval by the applicable program administrator, lender or authority.